Camera testing | Station | Dates | Objective |
ePix10ka small, 2M and NG prototype, ePix10ka small sidefacing 1mm Si | MFX | 15,21,22 July (backup shift) | Verify we understand the checker mark problem with the ePix10k small and 2M. Run the Non-Ghosting camera and get initial performance data; evaluate the ePix10ka small side facing 1mm Si. |
ePix10k2M.0 | XCS | 27 July | Timing scans for the ePix10k2M.0 detectors. 2 quads are miss-timed. Also contain info on the follow up measurements where we swapped fibers around. |
ePix10k small | CXI | 28 July | Perform a timing scan of the ePix10k small at CXI |
ePixHR | MFX | Aug 29, Sept 14+15 | Evaluate the operation and performance of the ePixHR detector (ideally ASIC v4) |
...
- MFX beamtime 15, 21 and 22 July 2023.
- XCS beamtime 27 July 2023.
- CXI beamtime 28 July 2023
- MFX beamtime Aug 29, Sept. 14+15 2023.
- epixM beamtimes in April, May, July, September, ... described here: ePixM5kHz results page