Below is a list of beamtimes and what is intended to be evaluated during those beamtimes:

Table 1. Beamtimes and what is intended to be evaluated.

Camera testing

Station

Dates

Objective

ePix10ka small, 2M and NG prototype, ePix10ka small sidefacing 1mm Si

MFX

15,21,22 July (backup shift)

Verify we understand the checker mark problem with the ePix10k small and 2M. Run the Non-Ghosting camera and get initial performance data; evaluate the ePix10ka small side facing 1mm Si.

ePix10k2M.0

XCS27 July

Timing scans for the ePix10k2M.0 detectors. 2 quads are miss-timed. Also contain info on the follow up measurements where we swapped fibers around.

ePix10k smallCXI28 JulyPerform a timing scan of the ePix10k small at CXI

ePixHR

MFX

Aug 29, Sept 14+15

Evaluate the operation and performance of the ePixHR detector (ideally ASIC v4)


Detailed plans and a list of measurements performed during the beamtime can be seen by following the links below: