Program
...
Postponed from day shift 9/8
...
For all following activities keep CU at 0 angle, direct beam in center of tower 3. to 11/8 swing because of non availability of beam on 9/8 and 10/8
particle | energy | trigger | events | purpose | mode | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
e | 2.5 | S2 S0+S2+NOSh+C1+C2 |
| complete full brem program at 2.5GeV | collect up to 2.4M evts combining with owl shift runs - same CU configuration | 10K | check beam position after restart | same CU configuration, change trigger, sync with AD | |||
None | none |
|
| pedestal run for CAL | CU BT22 | ||||||
e | 2.5 | S2 S0+S4S2+NOSh+C1+C2 | 100K | increase statistics for tagged photons | e calibration | with same CU configuration, change triggermagnet off, e trigger, NO AD | |||||
e | 1 | S2 S0+S2+NOSh+C1+C2 | 10K 100K | 1GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | ||||||
e | 0.5 | S2 S0+S2+NOSh+C1+C2 | 10K | 0.5 GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | ||||||
e | 1 | S2+S4+NOSh+NOS3+C1+C2 | 200K 100K | 1 GeV photon tagged | magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each | ||||||
e | 1 1 | S2+NOSh+C1+C2+Sback | 10K | test to redefine full-brem photon trigger to maximize efficiency | add Sback after tagger and in trigger, take data with no AD | e | 1 | S2+NOSh+C1+C2 | 10k | test to get full-brem+AD | read sync AD but full-brem trigger; test data readout rate and synchronization |
e | 1 | S2+NOSh+C1+C2(Sback?) |
| full brem at 1GeV | collect 2.4 M evts in 250K runs | ||||||
|
|
|
|
|
| ||||||
e | 2.5 | S2+S4+NOSh+C1+C2 | 100K | photon tagging | synchronized with AD; scan the 6 positions of the CU as posted next to the XYtable | ||||||
e | 2.5 S1+S2+NOSh+C1+C2 | 2.4M | full-brem | NON synchronized with AD; scan the 6 positions of the CU as posted next to the table |