LCLS Estimated IOC Count for Injector and BC1Table 1.1 lists the minimum number of VME CPU's that will be needed for system test May 21, 2006. Table: 1.1 | Area: Injector and BC1 | Date Needed: May 21, 2006 | Subsystem | Assigned To | MVME6100 | MVME5500 |
---|
BPMs | T. Straumann | ? | ? | Collimators | S. Peng | ? | ? | Fast Feedback | D. Fairley | ? | ? | Laser Steering | S. Peng | 7 | 1 | LLRF | D. Kotturi | 0 | 0 | Magnets | K. Luchini | 0 | 1 | MPS I | S. Norum | ? | ? | MPS II | A. Alarcon | 1 | 0 | PPS | Alarcon | 1 | 0 | BCS | Alarcon | 3 | 0 | Timing | D. Kotturi | 2 | 0 | Toroids | S.Peng | 1 | 0 | OTR/YAG | S. Peng | 9 | 0 | Wire Scanners | D. Murray | 2 | 0 | Vacuum | S. Schuh | ? | ? |
Table 1.2 lists the number of VME CPU's in-house as of March 9, 2006. Table: 1.2 | SLAC PO: [ 54842 | https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?ISREQ=yes&ID=0000115984 ] [ 58362 | https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?isreq=yes&id=119773 ][ 57669 | https://www-bis.slac.stanford.edu/slaconly/bin/purdetail.asp?isreq=yes&id=118962 ] | Model | Qty |
---|
MVME6100 | 11 | MVME5500 | 9 | Synergy PPC | ?? |
|