Attendance:
Conny, Philip, Bhavna, Kaz, Alex, Zongde, Xavier, Julian, Nolan, Lorenzo, Bojan, Dionisio, Dawood
Presentations:
Agenda/Notes:
- ePixMePixM:
- Beamtime prep, Status off:
- Getting the detector running in DAQ;
- awaiting for Ric Claus and CPO. Maybe working in a day or two?
- Install another detector in MFX today. (today at 11am)
- Bug Chris Ford to make the final connection to the server. (fiber pull done. Light check by Chris today)Done. Data recorded.
- Getting the fibers installed at MFX and to server;
- Done.
- Make drawings. Today at 11am.
- Physical setup to secure the camera;
- Chris Koerber has a solution. Thick sensor camera installed in spent beam area today Today at 11am.
- Checking we have the multitosingle mode converter box;
- Install at MFX today at 11am. Take the one from ASC.Yes, we have it.
- Cables and supplies to run the camera and what bias we need to apply
- Have all the fibers
- Need longer power cable with SHV HV connection (banana plugs could suffice if need be). Cable from Lupe middle of next week?
- We have all cables and power supplies.
- Bias = -50V. Keep an eye on current draw. (Installation today)Waiting from Chris Kenney to tell us bias voltage.
- Light shield to block visible light;
- Exists. Use black kapton tape to tape Taped over the sensor. Don't dismount bracket from thick sensor (risks damaging think sensor when attaching). yellow kapton. Test with flashlight today.
- Evaluate the data coming out of the detector;
- Data recorded. No evcode283 yet, but waiting for beam. Matt Weaver is also checking to make sure it's in the datastream.
- Many hot pixels/columns. Once final connections are made. Take dark data as soon as daq integration is done. (Bug Ric Claus)
- Testing the data analysis scripts and visualisations;
- In progress. Can be made for one module...need to scale up to all modules. (Philip, Zongde, Bhavna, Xavier)
- Negative signal, pedestals ~>20000ADU
- 15bits data, 1 bit gain
- asic[0] and asic[3] are not bonded. Only look at asic[1] and [2]. (data is epixm[4][192][384])
- ami2 - filter in evcode 283.
- Testing the timing scan and trigger rate setting script;
- Alex will work with Matt and Ric Claus.
- Timing scan tested....try again in mfx.
- Intensity scan should be ready (same as before).Pedestal: Standard auto-gain, soft-hi, soft-lo.
- Setting up the pre-setup meeting (include TID);
- Waiting for Sebastien for the pre-setup mtg. Forward to TIDDone.
- Get the measurement list together;
- Zongde
Get full list assuming everything works, and prioritize from there depending on how the measurements go.View file name Beamtime ePixM Measurements Plan Apr 2024.xlsx height 250
- Schedule the staffing;Decide during next Thursday's mtg.
- Ensure we have the needed support;
- Matt Weaver or Ric Claus or CPO AMI-2
- Getting the detector running in DAQ;
- Beamtime prep, Status off:
- HV test at TID needs to be done to see what bias we want to run at.