30 min | Status | All | - Group priorities review:
- Detectors for Run 18
- Jungfrau commissioning plan and commissioning tests (Comments on plan? meet with Meng)
- ePix10k2M (new) commissioning/calibration along same lines as JF (chiller problems?)
- ePix10k2M (old) metrology and test to match (Thursday metrology)
- ePix smalls tests to match
- Detectors under development
- RIXS-CCD Project Plan
- RIXS-CCD Concept Design (meeting w/STA update?)
- Anton project at UCB/SSL (waiting on milestone/schedule revision)
- SXR Downselect prep
- Lab 'commissioning'
- Marietta certification done
- Mini-X certification done
- Kimball certification
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- Laser table re-cert
Actions: - check with TID about status of small epix100/10ka. (Mark)
- check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
- attach burst valve to egun, (maybe) rotate turbo, and do vacuum test over several days (Conny/Rebecca)
- Laser recertification (Kaz)
- Wave8-V2 tests (Kaz)
- RIXS system pumpdown and vibration measurement (Conny/Rebecca)
Other news: - Data management meeting (pt. 2) July 2
- ePix Quads FDR completed, passed.
- ICD review with NEH 2.2 2:30pm today.
- Framing Camera whitepaper acknowledged by Kramer, no review yet.
- ePix10k2M calibration/communication progress continues, no escalation presently necessary.
- Priorities:
- JF commissioning tests.
- ePix10k setup, calibration.
- RIXS-CCD project plan/concept design
- Calibrations/procedure developments for detector deployments, starting with ePix.
- Wave8 readiness.
- BIO for racks in chase.
- Seismic table mount components received
|