Date

Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minDeployment 2-wk planKPPlans to support upcoming experiments (in-work, mapping detectors to experiments in new R18 schedule)
30 minStatusAll
  • Group priorities review:
    • Detectors for Run 18
      • Jungfrau commissioning plan and commissioning tests (Comments on plan? meet with Meng)
      • ePix10k2M (new) commissioning/calibration along same lines as JF (chiller problems?)
      • ePix10k2M (old) metrology and test to match (Thursday metrology)
      • ePix smalls tests to match

    • Detectors under development
      • RIXS-CCD Project Plan
      • RIXS-CCD Concept Design (meeting w/STA update?)
      • Anton project at UCB/SSL (waiting on milestone/schedule revision)
      • SXR Downselect prep

    • Lab 'commissioning'
      • Marietta certification done
      • Mini-X certification done
      • Kimball certification
      • DAQ
        • Storage nodes
        • LCLS I/II compatibility
      • Table seismic
      • Laser table re-cert


Actions:

    • check with TID about status of small epix100/10ka. (Mark)
    • check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
    • attach burst valve to egun, (maybe) rotate turbo, and do vacuum test over several days (Conny/Rebecca)
    • Laser recertification (Kaz)
    • Wave8-V2 tests (Kaz)
    • RIXS system pumpdown and vibration measurement (Conny/Rebecca)



Other news:

  • Data management meeting (pt. 2) July 2
  • ePix Quads FDR completed, passed.
  • ICD review with NEH 2.2 2:30pm today.
  • Framing Camera whitepaper acknowledged by Kramer, no review yet.
  • ePix10k2M calibration/communication progress continues, no escalation presently necessary.


  • Priorities:
  • JF commissioning tests.
  • ePix10k setup, calibration.
  • RIXS-CCD project plan/concept design
  • Calibrations/procedure developments for detector deployments, starting with ePix.
  • Wave8 readiness.
  • BIO for racks in chase.
  • Seismic table mount components received
5 minBudget Updatemmck
  • M&S Status (Through May)



  • Labor snapshot (May. actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business  

Action items

  • ActionKazutaka Nakahara to circulate and/or post chiller manual to confluence.
  • ActionKazutaka Nakahara to run chiller over weekend to check stability, IOC performance.
  • ActionZimmerman, Kayla to provide update on the e-gun/RP JSA approval status.
  • Action:  Rebecca to rough out Concept Design for June 26 review.