30 min | Status | All | - JF4M initial shipment received. Power supply talks, cable tests next(?)
- Deep clean completed.
- Hansson: Hiring complete, DAPC approved. Expect arrival Dec/Jan. Need tasking plan.
- Trying to create compelling case for Tixel for September PEC...taking a long time, ongoing.
- ePix100s forwarded to TID for refurb?
- Need firmware on 10k small to test....status?
- SLAC-level Detector Strategy Task Force: Three meetings, presenting to SAC, SPC, and LDAC.
- Got no detector feedback from user's meeting...?
- DAQ rack plinth set received, fit questionable.
- Seismic table mount components received..to be installed.
- LDAC set for Dec. 3-4.
- Status of 2018 recommendations: 18 closed/complete, 13 in work/on track, 3 deferred/rejected (Doc available).
- NEED:
- RIXS-CCD need analysis of flux limitations (status?)
- 'White paper' on zero-suppression tradeoffs (in work).
- Data analysis on ePix prototypes tested in Run 17.
- Presentation on Jungfau 4M??
- Development Program: Managed to spend all development funding in FY19.
- Development options green-lighted:
Purchased new Cd rad source for testing ePix platform doneOK'd outside testing of ePix to ~10krad done, at Sandia- ePix dummy bond to Ge to test method and thermal ($70k)
- ePixHi-Z cold testing ($70k)
- Purchase of CZT material from Redlen ($15k)
- Tixel: Design sparse readout architecture ($100k).
- ePix: Design shingled high-rate camera ($100k)
SXR microwave annealing machine ($60k) done, received
Status: - RA: Time on drawings....progress ongoing. Four of the big 5 are out....still need 3-d part...looking at making two copies to test machining in house....submit by end of week?
- PH: Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
- Also one on thin-crystal heating at CXI.
- Need to discuss acquiring sensors from UXI collaboration.
- Need to ask what proper operating temperature is for the RIXS-CCD PCB....how should this be cooled?
- Wiring diagram for Jungfrau (Sameen)
- Need automated check on pedestal levels...Jason left and no one has picked up.....PH to follow up with Silke.
- Silke to establish a couple of data streams to examine performance on dropped shots etc.
- UXI options? Nothing until next year....Liam here this week.
- EMP testing confusing, un-grounded CSPAD testing this week...
- Mike Brown has set up ePix10k and ePix100 on XCS for software development...not done?
- DAQ can run ePix100, ePix10k, Jungfrau....can't yet save data.
- Need to check with Chris about data reduction from Run 17.
- KN:
- Getting ready for ePixBig test in-hutch on Wednesday to verify hutch is ready to go in Run 18.
- Need to get Mike and Dan talking to the JF kit...IoC on top of PSI scripts.
- Chicane for Marietta almost ready to install eGun.
- Need to coordinate 4-fiber Wave8 with CDS...single vs multimode.
- Matt Church helping with Wave8 ?? Need to mount close as possible to flange.
- All JF Cables are in workm
- KZ: Draft RIXS CCD procedure completed.
- ePix10k requires new MPODS, working issue
- Status documentation/procedures effort
- KZ:
- RIXS-CCD Procedure draft complete. Review at next detector meeting??
- RIXS-CCD setup work
- Toolbox organization/reorder scheme.
|