Program
...
Postponed from day shift 9
...
For all following activities keep CU at 0 angle, direct beam in center of tower 3. /8 to 11/8 swing because of non availability of beam on 9/8 and 10/8
particle | energy | trigger | events | purpose | mode notes | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|
e | 2 2.5 | S2 S0+S2+NOSh+C1+C2 | 100k | synchronized with AD but full-brem trigger; test data readout rate and synchronization | 10K | check beam position after restart | same CU configuration, change trigger, sync with AD | ||||
None | none |
|
| pedestal run for CAL | CU BT22 | ||||||
e | 2.5 | S0+S2+NOSh+C1+C2 | 100K | e calibration | same CU configuration, magnet off, e trigger, NO AD | ||||||
e | 1 | S0+S2 | e | 2.5 | S2+S4+NOSh+C1+C2 | 100K | synchronized with AD; scan the 6 positions of the CU as posted next to the XYtable | e | 1GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | |
e | 0.5 | S0 2.5 | 10K | 0.5 GeV e in the CU for calibration | magnet off; check position of beam wrt to dump | ||||||
e | 1 | S2+S4+NOSh+NOS3+C1+C2 | 100K | 1 GeV photon tagged | magnet on at scaled current (240A - CHECK current-BL calibration); collect runs of 25K evts each | ||||||
e | 1 | S2+NOSh+C1+C2 | 10k | test to get full-brem+AD | read sync AD but full-brem trigger; test data readout rate and synchronization | 2.4M | NON synchronized with AD; full-brem run; scan the 6 positions of the CU as posted next to the table |