Documents for Type-I services construction are gathered in this page:
Bundle Production
The production table can be found HERE.
Below is the pre-production table.
Serial Number | Date produced Shipped | Stave | Type | Length | AXON | DCS Staves | L Potting | Comments | L AXON | L Data | Comments | |||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Pre-Production | IBL-TypeI-03 | 15 June 2013 | Long | Humidity | n/a | Pre-production |||||||||||
IBL-TypeI-01 | April 2013 |
|
| n/a |
| n/a |
|
|
| Electrical cable | ||||||
IBL-TypeI-02 | 01 June 2013 |
|
| Long |
| Humidity |
|
|
|
| Pre-production at CERN, substitute power connector | |||||
IBL-TypeI-03 | 15 June 2013 |
|
|
|
| Long |
| Humidity |
|
|
|
Material Inventory List
...
Material
...
Needed
...
In hands
...
Comments
...
Potting ferrule
...
80
...
100
...
...
Connector Board
...
40
...
50
...
...
ConnB Shells
...
40
...
8
...
...
ConnB Shell Nuts
...
80
...
...
...
ConnB Square Nuts
...
40
...
41
...
...
ConnB Ferrule
...
40
...
45
...
...
Cable Board
...
40
...
50
...
...
CB NTC
...
40
...
100
...
...
Cooling Pipe NTC
...
20
...
100
...
...
PP1 NTC
...
20
...
100
...
...
CB Humidity
...
20
...
84
...
...
...
...
...
Pre-production at CERN, substitute power connector | ||||||||||
IBL-TypeI-04 | 30 June 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production at CERN, substitute power connector |
IBL-TypeI-05 | 23 July 2013 |
|
| Long |
| Humidity |
|
|
| Pre-production , substitute power connector |
IBL-TypeI-06 | 19 August 2013 | 05 | 02 | Long |
| Humidity | 2460 | 3487 | 4960 | Bad AXON Connector. |
IBL-TypeI-07 | 10 Oct. 2013 | 05 | 02 | Long | 003 | Humidity | 2458 | 3483 | 4946 | AWG22 Wires for LV. |
Q/A Documents:
BareWireResistance.xlsx
LV_drop.xlsx
Touch-1 Resistance Measurements
Data Transmissions LogFiles
Documentations:
Type-I-QA-20141102.docx [Touch1 pictures: 1, 2, 3, 4, 5, 6, 7 ]
...
...
...
...
distance_IPT_12June.jpg ATUIBLP_0034_12June.pdf ATUIBLP_0070_12June.pdf
Type1_assembly_
...
V7.docx
...
Type-1 assembly_3.docx
IBLType1Cable.ver5-change.docx
...
[V6] [V5, Comments] [V4] [V3]
Type1 Potting Procedure
IBLType1Cable.ver6.pdf [V5->V6 change] [V5 ]
IBL-type1-service_
...
21.xlsx
...
ATUIBLP_0034_IBL_TYPE01_BUNDLE_ASS_v5.pdf
...
, IBL-type1-dimension.xlsx
...
Installation Barber Pole pictures: [1, 2, 3, 4, 5 ]
SLAC-Prod.xlsx
...
Contacts / Practical Info
Building 33 clean room phone ext: x8951