30 min | Status | AllNot moving to Stage 1 today. SIP modified but not lifted. Lab population up to ~375 this week under 'Stage 0'.B84/B33 JSAs somewhere in TID approval cycle. | - Group priorities review:
- Detectors for Run 18
- Jungfrau commissioning plan and commissioning tests (meet with Meng)
- ePix10k2M (new) commissioning/calibration along same lines as JF
- ePix10k2M (old) metrology and test to match
- ePix smalls tests to match
- Detectors under development
- RIXS-CCD Project Plan
- RIXS-CCD Concept Design (meet w/STA for power estimate, sitrling experience?)
- Anton project at UCB/SSL
- SXR Downselect prep
- Lab 'commissioning'
- Marietta certification
- Mini-X certification
- Kimball certification
- DAQ
- Storage nodes
- LCLS I/II compatibility
- Table seismic
- Laser table re-cert
Actions: - check with TID about status of small epix100/10ka. (Mark)
- check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
- attach burst valve to egun, (maybe) rotate turbo, and do vacuum test over several days (Conny/Rebecca)
- Laser recertification (Kaz)
- Wave8-V2 tests (Kaz)
- RIXS system pumpdown and vibration measurement (Conny/Rebecca)
Other news: - B84/B33 JSAs approved.
- ePix Quads FDR completed, passed
ePix Quads FDR later this week this week.Chiller instability status after weekend run- 2:30pm today.
- Framing Camera whitepaper acknowledged by Kramer, no review yet.
- Stress-test test of JF @CXI complete.
- ePix10k2M calibration/communication
status. Escaclate?Jungfrau 4M calibration/commissioning plan- progress continues, no escalation presently necessary.
Stress test- commissioning tests.
- ePix10k setup, calibration.
- RIXS-CCD project plan/concept design
- Calibrations/procedure developments for detector deployments, starting with ePix.
- Wave8 readiness.
- BIO for racks in chase.
- Seismic table mount components received
.- RA: Silke help with scheduling interns...
- Need help with test plan and verification of J-Box plans for install.
PH: Collaboration meeting in ABQ....Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MECCalibration discussions w/ KP.Cable drawing standards have been changed....need updates? KN:- Need to get Mike and Dan talking to the JF kit...IoC on top of PSI script
- eGun installed in Marietta....need to buy HiCube 80.
- All JF4M Cables are in. Making second umbilical?
- MPOD cables ....need Hi-V cables for ASC and MFX....follow up with Lupe.
KP:Working procedures/calibration with Philip.Working docs with Silke for online access. |