Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
30 minDeployment 2-wk planKPPlans to support upcoming experiments (in-work, mapping detectors to experiments in new R18 schedule)
30 minStatusAll
  • Not moving to Stage 1 today. SIP modified but not lifted.
  • Lab population up to ~375 this week under 'Stage 0'.
  • B84/B33 JSAs somewhere in TID approval cycle.
    • Group priorities review:
      • Detectors for Run 18
        • Jungfrau commissioning plan and commissioning tests (meet with Meng)
        • ePix10k2M (new) commissioning/calibration along same lines as JF
        • ePix10k2M (old) metrology and test to match
        • ePix smalls tests to match

      • Detectors under development
        • RIXS-CCD Project Plan
        • RIXS-CCD Concept Design (meet w/STA for power estimate, sitrling experience?)
        • Anton project at UCB/SSL
        • SXR Downselect prep

      • Lab 'commissioning'
        • Marietta certification
        • Mini-X certification
        • Kimball certification
        • DAQ
          • Storage nodes
          • LCLS I/II compatibility
        • Table seismic
        • Laser table re-cert


    Actions:

      • check with TID about status of small epix100/10ka. (Mark)
      • check what cables we need for the in-vac epix100 setup in MEC and CXI. (Philip)
      • attach burst valve to egun, (maybe) rotate turbo, and do vacuum test over several days (Conny/Rebecca)
      • Laser recertification (Kaz)
      • Wave8-V2 tests (Kaz)
      • RIXS system pumpdown and vibration measurement (Conny/Rebecca)



    Other news:

    • B84/B33 JSAs approved.
    • ePix Quads FDR completed, passed
    ePix Quads FDR later this week
    • .
    • ICD review with NEH 2.2
    this week.Chiller instability status after weekend run
    • 2:30pm today.
    • Framing Camera whitepaper acknowledged by Kramer, no review yet.
    • Stress-test test of JF @CXI complete.
    • ePix10k2M calibration/communication
    status. Escaclate?Jungfrau 4M calibration/commissioning plan
    • progress continues, no escalation presently necessary.


    • Priorities:
    • JF
    Stress test
    • commissioning tests.
    • ePix10k setup, calibration.
    • RIXS-CCD project plan/concept design
    • Calibrations/procedure developments for detector deployments, starting with ePix.
    • Wave8 readiness.
    • BIO for racks in chase.
    • Seismic table mount components received
    .
    • Status:
    • RA: Silke help with scheduling interns...
      • Need help with test plan and verification of J-Box plans for install.
    PH: Collaboration meeting in ABQ....
  • Writing RIXS Talk. Submitted two in-house proposals...one on TID sensors, one on UXI@MEC
  • Calibration discussions w/ KP.
  • Cable drawing standards have been changed....need updates?
    KN:
    • Need to get Mike and Dan talking to the JF kit...IoC on top of PSI script
    • eGun installed in Marietta....need to buy HiCube 80.
    • All JF4M Cables are in. Making second umbilical?
    • MPOD cables ....need Hi-V cables for ASC and MFX....follow up with Lupe.
    KP:Working procedures/calibration with Philip.
  • Working docs with Silke for online access.
  • 5 minBudget Updatemmck
    • M&S Status (Through DecemberMay)

    Image AddedImage Removed

    • Labor snapshot (DecMay. actuals):
      Image RemovedImage Added

    15 minReview ASC First Projectsall

    Coordinate/update lab schedule.

    10 minAny other business  

    Action items

    •  ActionKazutaka Nakahara to circulate and/or post chiller manual to confluence.
    •  ActionKazutaka Nakahara to run chiller over weekend to check stability, IOC performance.
    •  Action:  Group to review ePix cal/comm status on Monday’s call and need for escalation.
    •  ActionConny Hansson to look through Philip’s checklists to refine a written JF commissioning plan.
    •  ActionZimmerman, Kayla to provide update on the e-gun/RP JSA approval status.
    •  ActionZimmerman, Kayla to write up a draft epix10k deployment JSA, based on step-by-step.
    •  Action:  Rebecca to rough out Concept Design for June 26 review.