Run program for GSI beam test
Assumption is to take data at 25Hz average (100Hz average rate * 1/2 duty cycle from accelerator * 1/2 duty cycle from therapy parasitic mode)
Purpose | preferred schedule | Ion | Energy | Rate on CU | Beam focus | Trigger* | Runs** | notes reference | preliminary analysis | ||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Test multiple trigger engines prior to beam | nov 17 | NA | NA | NA | NA | all BTs |
| change CNO thresholds, periodic frequency DAQ team | |||||||||
Monitor beam rate and conditions | nov 18, 8-1110 | C | 1.5Gev/n | 10 50-1000Hz 500Hz | play with focus to change beam intensityon CU | BT53 | verify count rate on external trigger, set it to ~100Hz. | 2519-2522 | spill is 6s long. monitor shows counts vary between 50-500Hz. | ||||||||
0 degree configuration | nov 18 11-16 18 | C | 1.5Gev/n | 10 100-100Hz-1KHz 200Hz | nominal | BT50, BT51, BT54 |
| ||||||||||
Tracker saturation | nov 18 16-18 | C | 1.5Gev/n | 10-1KHz | nominal + focus on CU | BT3 | take runs with TKR trigger only vs beam rate (10-100-1K) |
| |||||||||
2527-2534 | 250Kevts at ~200Hz | CAL studies: | |||||||||||||||
30 degree | nov 18 | CAL calibration comparison with previous results | nov 18 18-20 | C | 1.5GeV/n | 100Hz | 260Hz | nominal far and near focus | BT50, BT51 | CAL team | 30 degree | , BT54 | 2535-2537 for beam tuning | 660Kevts |
| ||
-60 degree | nov 18 nov 18 20-21 | C | 1.5GeV/n | 100Hz 270Hz | nominal | BT50 | move CU at 30 degrees, take some events to check ACD CNO threshold for new hit tiles |
| |||||||||
30 degree configuration | |||||||||||||||||
, BT51, BT54, BT56 | 2550-2553 | 645Kevts | beam through tower3 side, no ACD tile; BT50, BT51 have a CNO trigger engine which is not satisifed - most events are therefore read with the std engine auto-range, ZS associated with any other trigger than CNO | ||||||||||||||
0 degree | nov 18 7PM nov 18 21 - nov 19 2 | C | 1.5GeV/n | 270Hz 100Hz | nominal | BT3,BT50, BT51 , BT54 | per BT type collect: |
| |||||||||
60 degree or twr 3 configuration? | nov 19 2-7 | C | 1.5GeV/n | 100Hz | nominal | BT50, BT51, BT54 |
|
| |||||||||
Energy scan | nov 19 | C,Xe | 600MeV/n - 1.5GeV/n in steps | 10-1000Hz | far and near focus | BT51 | attempt to simulate different ions by varying ionization energy | nicola | |||||||||
Secondary ions with target | nov 19 | Xe | 1.5GeV/n | 10-1000Hz | far and near focus | BT50 | attempt to get different ions by shooting beam through a target - need verification with GSI people | benoit | |||||||||
| 2572 with BT3 (TKR only trigger) - 250Kevts | noticed larger fraction of TEM errors (from 2% to 3.5%) - probably due to higher rate in first part of spill when getting beam back from therapy | |||||||||||||||
0 degree Xe | nov 19 | Xe | 1GeV/n | 200hZ | nominal | BT50-BT51 | 2577-2581 | played with fifo settings to reduce fifo full errors | 2577 very high rate (10KHz) | ||||||||
0 degree Xe on Al target | nov 19 4.30AM | Xe | 1GeV/n | 200Hz-1KHz | nominal | BT53 with different FIFO full settings | 2582-2594 | attempt to get different ions by shooting beam through a target | 2582 1.6KHz rate | ||||||||
scintillation measurement in CDE | nov 19 | Xe | 1GeV/n | 200Hz | nominal | NA | NA - contact Benoit to get data | place a CAL cristal in front of CU and record signal pulse | clear saturated signal from Xe, secondary peaks visible | ||||||||
charge injection with beam | nov 19 | Xe | 1GeV/n | Charge injection in CAL with beam | nov 19 | C | 10 600-1000Hz | far and near focus | BT50 | check pedestal restoration with beam ON, explore different beam rates; can use existing CalibGenCAL script | sasha | Charge injection in TKR with beam | nominal | CalibGen | Xe beam: 2595-2607 | performed with beam while taking scintillation measurement |
|
Very low rate | nov 19 | C | 1.5GeV/n | 10-1000Hz | far and near focus | BT50 | as low as possible | nominal | BT58 | 2627 | ~15Kevts |
| |||||
0 degree | check rate effect in TKR signal; must identify CI script and plots to monitor | leon, TKR team | scintillation measurement in CDE | nov 19 | C , Xe? | 1.5GeV/n | 100Hz |
| NA | place another detector upstream and monitor signal pulse | benoit ~600Hz | nominal | BT50,BT51,BT53 |
| compare with runs taken before Xe beam | not performed |
* see here for full details on trigger configurations
** 70000 omitted from run number