The new servers are running the same OS and Oracle versions as our current production setup, so we do not anticipate any compatibility problems with the new servers. We have done extensive testing of the performance and compatibility of the new servers as detailed below.

Oracle hardware details

Image Added

Testing

Scalability Testing

...

We were able to run 1500 simulated MC jobs continuously for prolonged periods of time, and were able to ingest on orbits worth of trending data in a little over 1 minute.

Failover Testing

Failover testing will be performed on Monday April 7We have tested the ability to failover to the backup database if the primary database fails, and to resync the primary and secondary database. This procedure will be used if the primary database becomes inoperable for an extended period due to hardware or software failure. Currently failover is a manual operation requiring an oracle admin to designate the backup server as "primary". No change is required to GLAST software to switchover to the backup database.

Switchover methodology

We propose to switchover to the new oracle databases sometime during the period April 8-11. We will perform the following steps

...