  • 10-17 Oct. in H6 with the EUDET telescope
  • 24-04 Nov. in H8 (depending on if we can switch with ALFA) with the BAT and Morpurgo magnet
  • 20-25 Nov. in H6 with the BAT (preliminary)

Official documents: Periods and Calendar

See todo list

The test beam setup is based on two main components:
    - Silicon telescope (so called "Bonn" telescope or BAT) with its own DAQ and monitoring. Have integrated the TurboDAQ system.
    - 3D assemblies read out by TurboDAQ (1 TurboDAQ per tested board). We shall have at least 3 TurboDAQ available, plus one in the lab (building 161).

...