The detector will be connected to the MM to SM converter box (input LEAP0) using the 24 channel type B cable. LEAP0 LANE[3:0] and LANE[7:4] ports will be connected to the data acquisition server using two FO cables and 4 transceivers. LANE[11:9] (namely lane 11) will be connected to the LCLSII timing system using the MTP fiber breakout, remaining transceiver and cable. The MM to SM converter box has to be as close as possible to the detector.

...