Beamtime ePixHR Feb 16/17 2024 - v2.xlsx
Shift scheduling:
Feb 16 | Feb 17 | |
---|---|---|
shift 1 (6p-1a) | Philip, Dionisio, Kaz, Lorenzo, Alex (remote) | Bhavna, Philip, Julian, Bojan, Alex (remote) |
shift 2 (11p-6a) | Bhavna, Zongde, Julian, Bojan, Dionisio (tentative), Alex (remote) | Kaz, Zongde, Alex (remote) |
Lorenzo presentation and links:
...
- Philip brought up that descrambling appears to not put the detector in the correct position. Dionisio has requested multi asic hardware for properly debugging this.
- Lorenzo presentation:
- We should run at 2.6V, it improved the linearity (both v1 and v2 has been updated to supply 2.6V to the ASIC now);
To Do:
Things to check before beamtime
- Run ePixHR in RIXS DAQ with 5160/120
- Test pedestal and timing scan scripts
- Check that pedestal scan can run with large event numbers per gain mode (for temp stabilization)
- Temp stabilization (configuration time, or add time at start of ever run?) – check during beamtime
- Set temp to 15C/to the degree possible before beamtime
- Test Grafana for live temp readout
- Documentation
- Take test data pre-beam:
- 5 pedestal
- Timing scan without beam
- ACQ start on scope