Attendees:
-----
Action Items:
Task report | ||||
---|---|---|---|---|
|
...
- Jama requirements can be grouped in a baseline version that can be considered controlled.
- Jama baselines capture single or groups of requirements and their specific version.
- Will ensure we can reference baselines without concern of dynamic change.
Action Items:
- Send out timing slides (Tyler, SLAC)
- Send Ken Terzi the rack space allocation for timing hardware (Jing, SLAC)
- Determine proximity requirements relative to front end oscillator for high precision timing hardware and send to LLNL (?, SLAC)
- Negotiate placement of hardware in which racks (all)
- When ready to specify actual SP front end laser, purchase to SLAC’s input/output interface specs to ensure consistency with Gen 2 setup and signals (Reagan, LLNL)