Camera

type

Aim

Date at ASC

Previous delivery date

ePixHR5kHz

ASIC v2.

Integration into the LCLS-II DAQ and initial testing to feed into ASIC v3. submission.

April 2022


ePixHR5kHz

ASIC v2.

Integration into the LCLS-II DAQ (new firmware structure) and initial testing.

October 2022


ePixHR5kHz

ASIC v3.

Integration into DAQ and initial testing of ASIC.

November 2022


ePixHR5kHz Quad

ASIC v3.

Integration into DAQ and software testing to allow for expansion to full camera (board integration for DAQ).

Feb 2023

December 2022

ePixHR5kHz

full Camera

ASIC v4.

Initial testing of full camera and in lab calibrations.

May 2023


...

Capability

Type

Aim

Date available

Previous availability date

Running LCLS-II detectors at XPP.

LCLS beam line testing

Run fiber from RIXS to XPP so LCLS-II detectors (ePixM, ePixHR) can be tested there

Feb-March 2023

N/A

Running LCLS-II detectors at FEH.

LCLS beam line testing

Run fiber (DRP solution) from RIXS to FEH so LCLS-II detectors (ePixM, ePixHR) can be tested at MFX/XCS/CXI

June 2023 (subject to availability of installed fiber cable)

N/A