...
- Collect walk-ins
- Notes review
- Name proposal
- "The collective" ack. Barry
- LLE Visit planning
- Topics/ discussion requests for LLNL?
- ICD Discussion
- Next steps in requirements development
- Review conops for all parts of the collective, identify all signals and diagnostics that must and would be nice to include in the DAQ stream
- Consider:
- What kind of diagnostic data is required for the science mission and the operations needs?
- Need to determine space and rate constraints of the SLAC EPICS archiver system
- How the diagnostic data will be used in the science goals of the facility?
- This determines what really needs to be included in the DAQ and how synchronously it must be acquired.
- How the diagnostic data will be used in optimizing and maintaining laser system performance
- Could the DAQ system be leveraged be used in this regard if the EPICS archiver won't be enough? Jana B. Thayer
- This information will help to define our control system infrastructure requirements
- Controls hardware volume and cable tray estimates
- Need to develop high-level estimates for all systems in the collective as the cavern dimensions and floorplans are being set right now.
- Requirements lists
- Debuted the new requirements list portal for Jama requirements capture
- This portal is being used by SLAC to capture requirements before they are programmed into Jama
Action items
- Follow up with LLE and LLNL AHJ to connect with SLAC EEIP to hopefully get Ch8 requirements satisfied by local authorities, avoid having to redo EEIP upon arrival at SLAC.
-
Past meeting AI
{"serverDuration": 49, "requestCorrelationId": "1940056ad5fb15b4"}