  • Ring Loading Tooling, 19-1 RD53a
  • Handling Frame, 19-1 RD53a OB Stave
  • Shipping Box, 19-1 RD53a OB Stave
  • Stave Loading Tooling, 19-1 RD53a OB Stave
  • Stave Loading Tooling, 19-1 RD53a IB Stave

Ring Loading Tooling

Ring loading glue locations drawing (not released): REF-000160474 (LOADING FIXTURE, 19-1 RING).pdf

...

Interface block to join Stave and Handling Frame (drawing not released):


Shipping Box:


Stave Loading Tooling, 19-1 OB Stave

Version 2, revised, Stave Loading Tooling drawing drafts (not released):

...

ItemsVendorDateResponse
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
GoProto3/3/2022Working on quote
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
SLAC machine shop3/4/2022
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
KAL Machining3/7/2022
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Parametric USA3/7/2022Working on quote
  • REF-000203575 (BASEPLATE AND PINS, LOADING FIXTURE)
  • REF-000205158 (PICK UP TABLE, RD53a QUAD)
  • REF-000202289 (LOADING BRIDGE)
Pro-Tek Manufacturing3/7/2022Received


Loading Tooling, OB Stave:

Section view:


Summary of requirements for loading 19-1 Outer Barrel Stave:

  • Load RD53a Quad modules (drawings: 150um, 400um) with connectors oriented as shown in picture above
  • Load modules onto 19-1 OB Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)
  • Glue layer thickness to be 100um -50/+100um
  • ESD protection during loading: grounding of tooling
  • Mechanical protection of wire bonds during loading: stay clear of wire bonds, handle modules using tooling only, consider covers/shields
  • Baseplate to be installed onto glue robot: weight limit 7kg (per manual)
  • Stave to be removed from baseplate and transferred to test box for QC testing

Summary of different requirements for loading 19-1 Inner Barrel Stave:

  • Load Triplet modules (drawing, .step)
  • Load onto 19-1 IB Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)

Summary of specifications:

  • Closely toleranced pins/bushings – same approach as used for 19-0 tooling
    • Requirement: +/-75um module position tolerance in local support coordinate system (per requirements document "ITk Pixel Module Loading Accuracy Requirements" AT2-IP-ES-006-v3)
    • Distribute tolerances:
      • +/-50um module position relative to loading tooling baseplate coordinate system (to avoid collisions with 100um gap between modules).
        • Dowel pins in baseplate – two per module location.
        • Bridge to have bushing and slot for precision fit onto dowel pins.
      • +/-25um local support position relative to loading tooling baseplate coordinate system (to accurately place modules to meet +/-75um requirement).
        • Dowel pin in baseplate – to accurately locate one end of the Stave in Z.
        • Tooling to fasten to mounting features on ends of Stave.
  • Glue with beads to control glue layer thickness
    • 100um dia beads, for ~75um glue layer thickness on carbon fiber.
    • Loading tooling does NOT control the glue layer thickness.
      • Loading bridge to rest on the module's pickup areas (vacuum pad locations) during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the baseplate – to apply pressure at all vacuum pad locations during gluing.
      • Loading bridge to have micrometer adjusters to level the tool relative to the pickup table – to make good contact between vacuum pads and module.
  • Vacuum pads to pick up modules
    • Vacuum pads to fit within clear areas on modules.
    • Height adjustment of vacuum pads while on pickup table.
    • Vacuum to securely hold modules.
  • Tolerances:

...

  • Stave length (flat region): 491.6mm
  • RD53a (19-1)
    • Modules length: 12*(41.1mm+.2mm)=495.6mm
    • 12 modules would result in 4mm overhang beyond end of stave. Plan not to load full stave anyway due to module availability.

Image Added

  • ITkPixV1 100um
    • Modules length: 12*(40.7mm+.2mm)=490.8mm
    • Appears to fit onto Stave. Module pitch (40.9mm) different from 19-1 pitch (41.3mm) so can't re-use 19-1 toolingwould need to make a new baseplate with this pitch.
  • RD53a Triplet (19-1)
    • Modules length: 8*(61.29mm+.15mm)=491.52mm
    • Appears to fit onto Stave.


Stave Loading Tooling, 19-1 IB Stave

Requirements - see OB Stave requirements above.

...

Summary of different requirements for loading 19-1 Inner Barrel Stave:

  • Load Triplet modules (drawing, .step)
  • Load onto 19-1 IB Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions: 200um nominal gap / 100 micron minimum gap between modules (no assembly drawing yet showing modules on stave)