...
- Re-use tooling where possible.
- Using beads to set glue thickness; no longer need dial indicators or differential adjusters.
- Use 2 sets of micrometer adjusters (absolute scale).
- Add Consider adding soft material to vacuum pads for better sealing and smoothness.Consider adding a hole pattern for trussing / support below the 19-1 Stave baseplate.
- Reconfirm that Stave and Module CADs / drawings are compatible with tooling, before manufacture.
- Use dowel pins and screw interface to ends of Stave (locate same as in production assembly).
- Consider longer dowel pins in the baseplate (help locate the bridge, without pivoting).
- Consider handling frame integration.
...