Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Stave Loading Tooling in progress. Handling Frame and Shipping Box added for Stave. Drawings in progress created (not yet reviewed/released) for shipping box.

Shipping box drawings draft (not released): REF-000202479 (SHIPPING AND STORAGE FIXTURE, OB STAVE, 19-1) CHECKPRINT 14FEB2022.zip

...