- Re-use tooling from 19-1 Quad loading bridge; make new 19-1 linear Triplet loading bridge and tooling.
- Using beads to set glue thickness; no longer need dial indicators or differential adjusters.
- Use 2 sets of micrometer adjusters (absolute scale).
- Add soft material to vacuum pads for better sealing and smoothness.
- Consider adding a hole patterns for trussing / support below the 19-1 Stave baseplate.
- Reconfirm that Stave and Module CADs / drawings are compatible with tooling, before manufacture.
- Use dowel pins and screw interface to ends of Stave (locate same as in production assembly).
- Consider longer dowel pins in the baseplate (help locate the bridge, without pivoting).
- Consider taper pins / "coarse" dowels to line up the precision dowels.
- Consider handling frame for transfer from loading fixture to QC Box.
- Consider covers over modules already installed.
Some past presentations:
- 30 March 2021: Tooling and Plans for Loading, 19-0/1, Stave and Ring