Summary of different requirements for loading 19-1 Inner Barrel Stave:

  • Load Triplet modules (drawing on EDMS, .step)
  • Load onto 19-1 IB Stave (no drawing yet, preliminary CAD on LBL Windchill site)
  • Load without collisions (no assembly drawing yet)

...