Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Prepare

  • Verify power off.  (MPOD panel or IoC panel)
  • Install detector in Marietta.
  • Connect chiller, start flow.
  • Connect data fiber.
  • Connect gas line if applicable, start flow at 5l/m.

...