Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Detector mounted to motorized stage, powered up nominally at 0845.  Allow 15 min to stabilize.
  • Failed 'epix10k_pedestals' script.  Detector looks good in AMI (considering no peds).
  • ~0930 Q1 tripped....reset with wider env limits.
  • Silke thinks pedestal script is fixed...'epix10_pedestals', then 'makepeds' to load.  Seems good.  Check timing first.
  • Move integration window via acqToasicRDDelay (1 unit = 10ns).  Started ~78032, verified off at 68032, so good @78k.
  • Ag behenate, all five gain settings.  No attenuation.  Hi/Lo gain autorange is no good.  Quad 1 is way off.
  • Set fixed high, make new pedestal, record ring shape for geometry.
  • While checking motion limits to adjust ring coverage, we handed off the beam to AD and they were unable to return it for a couple of hours....
  • Record MPOD voltage/currents:

     

     

    ChannelLineVI
    oHV0200.000V0.000A
    1HV1200.0000.000
    2HV2200.0040.000
    3HV3200.0010.000
    100AVDD06.0064.314
    101DVDD06.0011.484
    102AVDD16.0024.278
    103DVDD16.0001.488
    104AVDD26.0044.276
    105DVDD26.0001.506
    106AVDD36.0024.276
    107DVDD36.0001.541