  • Detector mounted to motorized stage, powered up nominally at 0845.  Allow 15 min to stabilize.
  • Failed 'epix10k_pedestals' script.  Detector looks good in AMI (considering no peds).
  • ~0930 Q1 tripped....reset with wider env limits.
  • Silke thinks pedestal script is fixed...'epix10_pedestals', then 'makepeds' to load.  Seems good.  Check timing first.
  • Move integration window via acqToasicRDDelay (1 unit = 10ns).  Started ~78032, verified off at 68032, so good @78k.
  • Ag behenate, all five gain settings.  No attenuation.  Hi/Lo gain autorange is no good.  Quad 1 is way off.
  • Set fixed high, make new pedestal, record ring shape for geometry.
  • While checking motion limits to adjust ring coverage, we handed off the beam to AD and they were unable to return it for a couple of hours....
  • Record voltage/currents:
          •  

             

            ChannelLineVI
            oHV0200.000V0.000A
            1HV1200.0000.000
            2HV2200.0040.000
            3HV3200.0010.000
            100AVDD06.0064.314
            101DVDD06.0011.484
            102AVDD16.0024.278
            103DVDD16.0001.488
            104AVDD26.0044.276
            105DVDD26.0001.506
            106AVDD36.0024.276
            107DVDD36.0001.541