    • Instructions from Kaz:
      - 1). Mount the detector using a black adapter plate.  Detector connected to the adapter
      plate using only 2 screws (not all 4). (In fact, do we even need the adapter plate?) Done.. Note: supplied adapter plate does not match mounting pattern in detector case.  Need to find alternate plate.
      2). - Prepare water chiller
      - Disconnect water chiller from network (if it's connected). Done.
      - Prime the water chiller using the short hose (in the FAR hall detector cabinet 
      lock key is 0624).  Run the pump at 100%, 50%, and 10%, 10minutes at each setting. (Done)
          15% = 2.8 l/m
          50% = 3.4 l/m
        100% = 4.4 l/m
      - Reconnect water chiller to network. (Done)
      - connect water chiller to detector, and start running.  Flow should be ~2.4LPM. (2.5l/m) (Done)
      3). epix10k2m power  - epix10k2m power
      - attach power cables to PDU...label cables if necessary.  (Done).  Do not attach to 
      epix10k2m yet.
      - pin-out the epix10k2m power cables (Done, values below).

       

      Quad0 Line

       

       
      MPOD CH
      A-M AVDD1V 100
      B-N AVDD1V 100
      C-P AVDD1V 100
      D-R AVDDsense0V 
      E-S DVDD1.5V 101
      F-G DVDDsense0V 
      U-V HV10V 0

       

      Quad1

         
      A-M AVDD2V 102
      B-N AVDD2V 102
      C-P AVDD2V 102
      D-R AVDDsense0V 
      E-S DVDD2.5V 103
      F-G DVDDsense0V 
      U-V HV20V 1

       

      Quad2

         
      A-M AVDD3V 104
      B-N AVDD3V 104
      C-P AVDD3V 104
      D-R AVDDsense0V 
      E-S DVDD3.5V 105
      F-G DVDDsense0V 
      U-V HV30V 2
      Quad3   
      A-M AVDD4V 106
      B-N AVDD4V 106
      C-P AVDD4V 106
      D-R AVDDsense0V 
      E-S DVDD4.5V 107
      F-G DVDDsense0V 
      U-V UV40 3

       

      - if pin-out is ok, turn off power, and connect cables to detector. (done)
      - If water is flowing, turn on power.  Holding off on this since there is no fiber available to let us know whether the detector is working.

    Notes:
  • Detector bolted to stand just out of x-ray beam per Chollet instruction.  To be positioned later.
  • Cables between MPOD and PDU connected.
  • 15 ft. ePix Quad cables labelled and connected.
  • Chiller loop short-circuited, run @18C and 15% power for ~10 min.  Had to refill water to eliminate bubbles....seemed easier to get rid of bubbles with reservoir cap removed/loose.