Agenda:
Notes:
Status SVT:
- Hardware – Matt Graham – Thinks everything is working.
- Except one sensor in layer 4 bottom one side (old numbering) which isn't working and probably not recoverable. (Perhaps front end board,)
- Two sensors, layer 6 bottom. that are not turned on, We hope to get those back.
- Layer 0 and 1 seem to be working. Not fully commissioned.
- Some DAQ Mapping issues that are being sorted out right now.
- We see hits when moved to 1.5mm.
- The SVT EVIO - the bank structure changed.
- Omar fixed this.
- Seems to be working except for the DAQ Map.
- Analysis:
- Branch: iss425 (started a while ago) for online monitoring.
- Many other branches are merged into this.
- We need to merge this with master. MAKE A TAG BEFORE THIS MERGE IS DONE.
- We can get clusters on sensors, we can get 3-D hits.
- We don't see any tracks yet.
- We don't have realistic pedestals, so the hits we get don't have realistic times.
- Timing in = middle peak for maximum sample lined up for low current. It looks OK.
- We need to get the pedestals into the database, for all 6 samples.
- No tracks are shown yet.
- Software path forward:
- Make a tag of the current master.
- Start a Run2019 branch that will function as the "master" for all 2019 related changes.
...
{"serverDuration": 49, "requestCorrelationId": "90f4030f9d4ac463"}