Purpose

preferred schedule

Ion

Energy

Rate on CU

Beam focus

Trigger

Runs*

notes

preliminary analysis

Test multiple trigger engines prior to beam

nov 17

NA

NA

NA

NA

all BTs

 

change CNO thresholds, periodic frequency


Monitor beam rate and conditions

nov 18, 8-10

C

1.5Gev/n

50-500Hz

play with focus to change beam intensityon CU

BT53

2519-2522

spill is 6s long. monitor shows counts vary between 50-500Hz.
nominal focus gives beam spot on CU ~cm - ok.
used magnet steerer to center spot on desired position (X=108,Y=-42)


0 degree configuration
Tracker performance
Rate Scan 
5 hrs

nov 18 

C

1.5Gev/n

100-200Hz

nominal

BT50, BT51, BT54

2527-2534

250Kevts at ~200Hz
180Kevts at ~100Hz

CAL studies:
thierry(cuts,\\, Evslayer, quenching)
philippe: (Evslayer,Evslayervstime)
ACD: Eric(PHvstrackpos)
TKR: Leon (cuts ,cluster_width)

30 degree

nov 18

C

1.5GeV/n

260Hz

nominal

BT50, BT51, BT54

2535-2537 for beam tuning
2539-2545

660Kevts

 

-60 degree

nov 18 

C

1.5GeV/n

270Hz

nominal

BT50, BT51, BT54, BT56

2550-2553

645Kevts

beam through tower3 side, no ACD tile; BT50, BT51 have a CNO trigger engine which is not satisifed - most events are therefore read with the std engine auto-range, ZS associated with any other trigger than CNO

0 degree  

nov 18 7PM

C

1.5GeV/n

270Hz

nominal

BT3,BT50, BT51



2572-2576

2572 with BT3 (TKR only trigger) - 250Kevts
2573-2576 550Kevts
2576 (120Kevts) with special readout schema (half layers readout all left, half all right)

noticed larger fraction of TEM errors (from 2% to 3.5%) - probably due to higher rate  in first part of spill when getting beam back from therapy
special tkr readout configuration significantly reduces number of TKR FIFO FULL errors

0 degree Xe

nov 19

Xe

1.5GeV/n

`200hZ 200hZ

  nominal

BT50-BT51

 

attempt to get different ions by shooting beam through a target
collect ~600K

 

-60 degree Xe

nov 19

Xe

1.5GeV/n

`200hZ

  nominal

BT50

 

attempt to get different ions by shooting beam through a target

 

0 degree Xe on Al target

nov 19

Xe

1.5GeV/n

200Hz

  nominal

BT50

 

attempt to get different ions by shooting beam through a target

 

scintillation measurement in CDE

nov 19

Xe

1.5GeV/n

200Hz

nominal

NA

 

place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted

 

scintillation measurement in CDE

nov 19

C

1.5GeV/n

200Hz

nominal

NA

 

place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted


charge injection with beam

nov 19 12-13

C

1.5GeV/n

100Hz 200Hz

nominal

CalibGen,

 

keep beeam on

 

Energy scan

nov 19

C,Xe

600MeV/n - 1.5GeV/n in steps

10-1000Hz

200Hz

nominal far and near focus

BT51

 

attempt to simulate different ions by varying ionization energy

 

scintillation measurement in CDE  

nov 19

Xe

1.5GeV/n

C 100Hz

 

NA

  place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted

  scintillation measurement in CDE

nov 19

C

1.5GeV/n

100Hz

  NA

 

increase statistics or configuration with C beam until beam is off

  place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted

* 70000 omitted from run number

...