Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Purpose

preferred schedule

Ion

Energy

Rate on CU

Beam focus

Trigger

Runs*

notes

preliminary analysis

Test multiple trigger engines prior to beam

nov 17

NA

NA

NA

NA

all BTs

 

change CNO thresholds, periodic frequency


Monitor beam rate and conditions

nov 18, 8-10

C

1.5Gev/n

50-500Hz

play with focus to change beam intensityon CU

BT53

2519-2522

spill is 6s long. monitor shows counts vary between 50-500Hz.
nominal focus gives beam spot on CU ~cm - ok.
used magnet steerer to center spot on desired position (X=108,Y=-42)


0 degree configuration
Tracker performance
Rate Scan 
5 hrs

nov 18 11-16 18 

C

1.5Gev/n

100-200Hz

nominal

BT50, BT51, BT54

2527-2534

250Kevts at ~200Hz
180Kevts at ~100Hz

CAL studies:
thierry(cuts,\\, Evslayer, quenching)
philippe: (Evslayer,Evslayervstime)
ACD: Eric(PHvstrackpos)

30 degree

nov 18 20-21

C

1.5GeV/n

260Hz

nominal

BT50, BT51, BT54

2535-2537 for beam tuning
2539-2545

660Kevts move CU at 30 degrees, take some events to check ACD CNO threshold for new hit tiles

 

30 -60 degree configuration Tracker performance
Rate Scan
5 hrs

nov 18  nov 18 21 - nov 19 2

C

1.5GeV/n

100Hz 270Hz

nominal

BT50, BT51, BT54, BT56

 

per BT type collect:
1/2 hr at 100Hz(should be 45K)
10 min at 1KHz (should be 150K)
1 hr at 10Hz (should be 9K)
verify that multiple trigger engines work as expected
verify CU timing
check for CAL pedestal drift effect with BT54 (high periodic trigger); change periodic prescaler if necessary

 

60 degree  configuration Tracker performance
Rate Scan
5 hrs

2550-2553

645Kevts

beam through tower3 side, no ACD tile; BT50, BT51 have a CNO trigger engine which is not satisifed - most events are therefore read with the std engine auto-range, ZS associated with any other trigger than CNO

0 degree  

nov 18 7PM nov 19 2-7

C

1.5GeV/n

270Hz 100Hz

nominal

BT3,BT50, BT51 , BT54



2572-2575 

2572 with BT3 (TKR only trigger)
2575 with special readout schema (half layers readout all left, half all right)

noticed larger fraction of TEM errors (from 2% to 3.5%)

 

 

 

 

 

 

 

 

 

 

per BT type collect:
1/2 hr at 100Hz(should be 45K)
10 min at 1KHz (should be 150K)
1 hr at 10Hz (should be 9K)
verify that multiple trigger engines work as expected
verify CU timing
check for CAL pedestal drift effect with BT54 (high periodic trigger); change periodic prescaler if necessary

 

0 angle, twr 3 (no ACD tile)

nov 19 7-12

C

1.5GeV/n 

100Hz

nominal

BT50, BT51, BT54

 

per BT type collect:
1/2 hr at 100Hz(should be 45K)
10 min at 1KHz (should be 150K)
1 hr at 10Hz (should be 9K)
verify that multiple trigger engines work as expected
verify CU timing
check for CAL pedestal drift effect with BT54 (high periodic trigger); change periodic prescaler if necessary

 

charge injection with beam

nov 19 12-13

C

1.5GeV/n

100Hz

nominal

CalibGen,

 

keep beeam on

 

Energy scan

nov 19

C,Xe

600MeV/n - 1.5GeV/n in steps

10-1000Hz

far and near focus

BT51

 

attempt to simulate different ions by varying ionization energy

fabio

Secondary ions with target

nov 19

Xe

1.5GeV/n

10-1000Hz

far and near focus

BT50

 

attempt to get different ions by shooting beam through a target - need verification with GSI people

benoit

scintillation measurement in CDE

nov 19

Xe

1.5GeV/n

100Hz

 

NA

 

place another detector upstream and monitor signal pulse - move measurement before switching to Xe if C is wanted

benoit