...
Run period | Operation mode | Ions | Energy | Rate |
---|---|---|---|---|
18/11-8AM 19/11-8PM | daytime, parasitic mode to therapy (approx 20 min irradiation with 20 min break) | C, Xe (few hours overnight, TBC) | 1.5GeV/n | O(100)Hz/cm^2 |
The beam focus can be moved from a few meters upstream the detector down to the CU location, in order to enlarge or squeeze the beam spot. This feature can also be used to decrease/increase particle density.
Trigger considerations
Beam configuration
List of runs
Below is a list of specific run requests. Plese update the table and notify Luca Latronico
Purpose | preferred schedule | Ion | Energy | Rate on CU | Beam focus | CU configuration | Trigger | notes | contact |
---|---|---|---|---|---|---|---|---|---|
Test multiple trigger engines prior to beam | nov 16-17 | NA | NA | NA | NA | enable multiple trigger engines | CNO, periodic, internal trigger | take runs at different CNO thresholds, periodic trigger frequency | luca |
Test multiple trigger engines w beam | nov 18 | C | 1.5Gev/n | 100Hz | any | enable multiple trigger engines | CNO, periodic, internal trigger | take runs at different CNO thresholds, periodic trigger frequency | luca |