  • 3/27/2014 - Begin setting up P301 task for Pass8 re-MERIT.
  • 5/5/2014 - Please see the P301 JIRA for future chronology updates
  • 6/9/2014 - Begin block 2, through end of April 2014 (see JIRA)
  • 6/10/2014 - Block 2 complete
  • 10/21/2014 - Begin block 3, through end of September 2014 (see JIRA)
  • 10/22/2014 - Block 3 complete
  • 02/17/2014 - Begin block 4, through end of February 2015
  • 02/18/2015 - Block 4 complete
  • 04/16/2015 - Begin block 5, through 7 Apr 2015
  • 04/18/2015 - Block 5 complete
  • 06/11/2015 - Block 6 through 3 Jun 2015 started and completed.
  • 06/26/2015 - Block 7 - the final block - through 24 June 2015 started.
  • 06/27/2015 - Finished with Engines.
  • 08/05/2015 - Emergency reprocessing of 40 runs that suffered bad CAL calibrations. (See P300-ROOT for details.)

Configuration

Task Location

/nfs/farm/g/glast/u38/Reprocess-tasks/P301-MERIT

Task Status

http://glast-ground.slac.stanford.edu/Pipeline-II/index.jsp

TMineExt

3.3.8 (17 Apr 2014) as used from $GLAST_EXT/TMineExt

Classification worksheetv0r16 from $GLAST_EXT/extFiles

Run Selection

All MERIT files produced by P300-ROOT task

s/c data

P202 FT2SECONDS which will eventually become a "standard" Public Release https://confluence.slac.stanford.edu/display/SCIGRPS/Official+LAT+Datasets

Input Run List

ftp://ftp-glast.slac.stanford.edu/glast.u38/Reprocess-tasks/P301-MERIT/config/runList.txt

Code Variants used

redhat5-i686-32bit-gcc41, redhat5-x86_64-64bit-gcc41, redhat6-x86_64-64bit-gcc44 (Optimized)

Output Data Products

MERIT

...