Analysis: A look at the deposited-energy distributionsmeasured in the different CAL layers (Benoit): a factor close to 90%, dependent on the layer and the bombarding energy has to be applied to the data to get a good match with the data. It is not clear if this effect is only due to non-linearity in the extrapolation of the cosmic-muon calibration to the highest energy range.   Philippe showed the dependence of the measured energy on the distance to the log edge. David P. has studied the beam width, found to be much narrower in the data tahn than in the existing simulation runs. jan Jan and Niklas showed results on the FHE efficiency studied at 200 GeV. Since the deposited energy per layer is so high, there are only few events below threshold. The measurement has to measurement must be repeated at lower energy.    

...

 Communications

 - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 Online Report

 - DAQ sync studies going on
- CU: Ric investigating phasing errors

 Offline Report

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
- no CAL-HI triggers in last night data as  fhe values were saturated

 Program

 - Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions 
- ACD calibrations (ideally 5gev p, if NA 5gev e) 
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning

Notes 

 - Fill elogbook
- Take your shifts and launch runs yourself 
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="befefcc0ed4a86e2-91257f77-41494259-b998b442-810b6a95aa6257e18bb0d571"><ac:plain-text-body><![CDATA[- rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)