H4/SPS Daily meetings
September 9
Status: Smooth operation most of the time, but for a long interruption from 4:30 to 9 AM. Program of different geometrical configurations completed at 100 GeV. Specific configurations proposed by Leon (45 deg, wit
Program: Specific studies for the "baseline restoration" (aka "pedestal drift") problem (waiting for Ric's help to implement muti-engine capabilities). CAL pedestals, internal trigger runs. Switch to 100 GeV.
September 8
Status: Smooth operation most of the time. Program of different geometrical configurations completed at 280 GeV. FHE tests completed at 280 GeV (theshold=0.5 GeV-2 GeV) at 2 different positions. Cerenkov counters have been checked (there was connection problems), and are now working, although the efficiency is low.
...
Communications | - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning - CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient; fan added to cool XY table motors. Please look at the temperature during your shift |
Online Report
| - DAQ sync studies going on - CU: Ric investigating phasing errors |
Offline Report
| Francesco: - pipeline nicely running - 1st 1000 evetns in SVAC ntuple duplicated Claudia: - offline monitor requires script to parse rcReport info and link to MC files (Navid working on that) - MC and CU cooprdinate systems mismatch (check with Philippe) Dave: - no CAL-HI triggers in last night data as fhe values were saturated
|
Program | - Complete DAQ sync studies - perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay) - explore beam conditions - ACD calibrations (ideally 5gev p, if NA 5gev e) - CAL runs with e (Benoit) - Tagger calibration start on 29 morning |
Notes | - Fill elogbook - Take your shifts and launch runs yourself <ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="9df8ac33422ce97b-dd21069e-4ba94fa0-ab889a5e-fb65ac7af1a4bfcf8fbb7536"><ac:plain-text-body><![CDATA[- rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf) | ]]></ac:plain-text-body></ac:structured-macro> |