H4/SPS Daily meetings
September 8
Status: Smooth operation until 2:30 PM. Beam has been down since. Program of different geometrical configurations completed at 280 GeV. FHE tests started at 280 GeV (theshold=0.5 GeV-2 GeV). Cerenkov counters have been checked (there was connection problems), and are now working.
Program: Completion of FHE studies. Specific studies for the "baseline restoration" (aka "pedestal drift") problem.
September 7
Status: The beam is now much more stable. Calorimeter calibration completed, ACD calibration completed, scanning of 200 GeV configurations almost completed. Some runs were repeated after it was found that 4 scintillators used for the beam tuning were still in and be moved out. The pressure in the 2 Cerenkovs (1.2 bars so far) was set to 0. The dependence of the calorimeter measured energy as a function of rate has been investigated ("baseline restoration" problem). The effect is clearly visible. We decide to limit the rate to 400 Hz for the rest of the run. The time of the daily meeting will be moved to 5 PM to enable people on the previous night shift to attend.
...
Communications | - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning | |
Online Report | - DAQ sync studies going on | |
Offline Report | Francesco: | |
Program | - Complete DAQ sync studies | |
Notes | - Fill elogbook | ]]></ac:plain-text-body></ac:structured-macro> |