Francois’ talk at the Wednesday morning meeting on Aug 20th:
(Francois, please upload your talk to the confluence page above 08.20.2014 Wed….) 

Agenda:
1) Hall B work - update: Francois
Francois went through the slides he showed last Wed with comments on work since then.
2) Neutron shield inside the vacuum chamber between target and front-end-boards - update: Takashi and Marco
Marco has made a picture showing room for about 5 cm of borated plastic thickness which will give a factor of 2 reduction in neutrons on the mother boards.
3) Beam line controls and monitoring;
For meetings we should start to discuss the beam line controls and monitoring. So far all attention
was towards hardware installation. Now almost all the elements are now in place, and is time to get
grip on controls and monitoring, magnets, halo counters, scaler setups, harps etc. Who is going to
do what, interface with slow control group and accelerator ops. Stepan
Stepan may not be able to attend meeting - preparing talks for ARR.

4) Bubble Dosimeter to measure accurately neutrons near front-end-boards outside the vacuum chamber - see attachment.  Clive and Takashi

...