Online&DAQ Report |
OfflineReport | - Benoit on CAL pedestal drift: analysed rate effect in CAL crystal on pedestal for p runs; there is a clear effect that shows a broadening of the landau peak in CalEneSum at high rate; cutting on GemDeltaEvtTime and selecting particles at the beginning of the spill the Landau appear normal. The same is confirmed when analyzing few runs taken with lower p rate. Positron and electron runs seem unaffected. Michael looking at tkr data to seek for any rate effect; the idea is to monitor the efficiency of a FE vs GemDeltaEvtTIme, as no runs with different rates are available for p through the tkr. |
Program | - running smoothly with photons, program to be followed until tomorrow at 4PM maximum; perform full-brem at shallow angle tonight, and if time is short do not perform some of the runs at 500mev primary beam as we plan to reconfigure the tagger for the very low energy on monday and tuesday anyway |
Notes |
...
Communications | - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning | |
Online Report | - DAQ sync studies going on | |
Offline Report | Francesco: | |
Program | - Complete DAQ sync studies | |
Notes | - Fill elogbook | ]]></ac:plain-text-body></ac:structured-macro> |