 Program

- p program completed:
- 5M p at 10GeV through MMS at 30 degrees on twr3 (runs 1369-1379)
- 5M p at 6GeV through MMS at 30 degrees (runs 1380-1391); 2.5M (runs 1388-1391) evts taken with ACD OFF (see above)
- 2.5M p at 10GeV at 90 degrees through log 3 (runs 1392-1397) - ACD OFF
- 2.5M p at 10GeV at 90 degrees through log 2 (runs 1398-1403) - ACD OFF
- 2M p at 6GeV at 90 degrees through log 2 (runs 1392-1397) - ACD OFF
- p at 6GeV at 90 degrees through log 2 with different beam rate to test pedestal drift vs readout  and particle rate - ACD OFF
- 500k p at 10GeV at 90 degrees through log 2 (run 1413) with ACD ON
- more investigations on pedestal drift dependance (increased LAC threshold) and p at 0 and 60 degrees in the afternoon
proposed list of new runs here 

 Notes 

- due to a stop from PS, tomorrow morning shift will start at 9AM

August 15 - 13-3-005

 Communications

- 1st positron annihilation program completed overnight; shooted 1M  e+ and 1M e- through MMS placed in front of ACD tiles; CU oriented at small angle to increase path length in tracker and benefit from good tracking to point tracks to MMS target. Analysis will rely on ACD efficiency to reject e+. Target placement done using a pb brick to shadow the beam and then replacing the brick with the MMS target
- switched to p this morning; MMS target placed between the beam and the CU, shooting beam in 2 positions: small angle through twr3 towards twr2, 90 degrees entering twr3; will collect 10M p for each position at 10 and 6 gev; program will go on until tomorrow

...

 Communications

 - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 Online Report

 - DAQ sync studies going on
- CU: Ric investigating phasing errors

 Offline Report

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
- no CAL-HI triggers in last night data as  fhe values were saturated

 Program

 - Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions 
- ACD calibrations (ideally 5gev p, if NA 5gev e) 
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning

Notes 

 - Fill elogbook
- Take your shifts and launch runs yourself 
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="22e865a3061c9238-8c5d534a-45514e4c-b389a678-90891de62ca895de7af6783b"><ac:plain-text-body><![CDATA[- rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)