T9/PS run Daily Briefings - 3PM
Daily briefing minutes
August 15 - 13-3-005
Communications | - 1st positron annihilation program completed overnight; shooted 1M e+ and 1M e- through MMS placed in front of ACD tiles; CU oriented at small angle to increase path length in tracker and benefit from good tracking to point tracks to MMS target. Analysis will rely on ACD efficiency to reject e+. Target placement done using a pb brick to shadow the beam and then replacing the brick with the MMS target |
Online&DAQ Report | nothing to report |
OfflineReport | postponed to VRVS later; will have contributions on PSF (Claudia), E recon (Philippe), ACD cuts and positron runs (Philippe,Eric) |
Program | see above |
Notes | meet at 6PM in this meeting room for VRVS together |
August 14 - 32-1-A24
Communications | -Photon runs: completed position 1(0degree),2(30degree),3(50degree) both full brem and tagged with primary beam at 0.5,1,2.5GeV. currently taking events for position 2 in tagged mode with 1.75 gev primary beam to fully populate spectrum. |
...
Communications | - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning | |
Online Report | - DAQ sync studies going on | |
Offline Report | Francesco: | |
Program | - Complete DAQ sync studies | |
Notes | - Fill elogbook | ]]></ac:plain-text-body></ac:structured-macro> |