T9/PS run Daily Briefings - 3PM
Daily briefing minutes
August
...
12 - 32-
...
1-
...
A24
Communications | - running smoothly since yesterday, 2 CU positions completed at 2.5Gev, both tagged and full bream photons, 2 position completed at 1GeV tagged, currently running tagged photons at 0.5GeV with CU at 0 angle; 3rd position tagged photon by tonight, 3rd position full-brem at 2.5GeV for the owl shift |
...
OfflineReport | - Philippe presented plots from test sync runs with e which show how events with no energy in the cal point to the dump as measured by the 1st arm of the tagger |
Program | - agreed program here |
Notes |
August 11 - 32-S-C22
Communications | - Running since this morning 9AM with 2 spills, 3 spills available since 2.30PM. Currently taking tagged photons from 1GeV e beam |
...
OfflineReport | - Philippe reported on analysis of tagger calibration runs, tagger energy resolution same as what measured and presented by Nicola yesterday; one of the analyzed runs appear as 1.12GeV e in the rcReport, while the actual energy was 1.125, Luca B believe there is an issue with trunctation which the database people should address at SLAC (Eduardo to check) |
...
Communications | - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning | |
Online Report | - DAQ sync studies going on | |
Offline Report | Francesco: | |
Program | - Complete DAQ sync studies | |
Notes | - Fill elogbook | ]]></ac:plain-text-body></ac:structured-macro> |