Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Program

day 13 - swing 13

 particle

 energy

trigger

events

 purpose

mode

2.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 3

 sync with AD, magnet at 600A

e

2.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 4 (TBD)

 sync with AD, magnet at 600A

e

1

 S0+S2+S4+NOSh+NOS3+C1+C2

 100k

tagged photons scan CU position 4 (TBD)

 sync with AD, magnet at 240A

 

 

 

 

 

 move CU back to position 2, reconfigure the dump if necessary

e

0.5

 S0+S2+S4+NOSh+NOS3+C1+C2

 200K

tagged photons scan CU position 2

 

 

 

 

 

 

 move CU back to position 4, reconfigure dump if necessary

e

2.5

 S0+S2+NOSh+NOS3+C1+C2

 2M

full brem CU position 4 (TBD)

 no sync, magnet at 600A