- Nicola reported on ancillary recon performance and tagger studies; taggeed electrons momentum resolution is 3.5% (beam+MS+tagger), better than expected. Current AD recon only available locally, working to make it available to everybody here w/o waiting pipeline to update; also speeding up release process and pipeline re-processing of tagged photon runs
- Monica B reported on preliminary studies of Tkr TOT
- Eric C reported on ACD calibrations; mapping of electronics is correct, geometry and recon in place but reconstructed tracks show small discrepancies with expected tiles positions (order 1 cm); MIP peak to determine VETO threshold relocated with CR after changing timing, tiles behave differently, will make sense to cross-check with beam (as done with Alex at the beginning of the run);
- Monica P reported that the last generated MC file has a BL=0.45 which is wrong; Luca B to udpate confluence with correct conversion plot for current vs bending power and tell Francesco

...

 Communications

 - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 Online Report

 - DAQ sync studies going on
- CU: Ric investigating phasing errors

 Offline Report

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
- no CAL-HI triggers in last night data as  fhe values were saturated

 Program

 - Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions 
- ACD calibrations (ideally 5gev p, if NA 5gev e) 
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning

Notes 

 - Fill elogbook
- Take your shifts and launch runs yourself 
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="d72070b2bf9f968a-cb6978af-4c734117-8d59a9db-ce14908590396782a6b0f0d9"><ac:plain-text-body><![CDATA[- rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)