 Communications

  News from PS/PS Users Meeting:
-intervention on QED2 scheduled to end 5PM; spare was found to be not working, a second spare was available but needs to be equipped with a new vacuum chamber that will be taken from the 1st non good spare
- beam loss in the separation magnet between east hall south and north branch; currently this is the reason why we have no beam; if replacement of QED2 cures the loss we should get beam back tonight, otherwise a technical intervention will be required, and cooling time is 4 days minimum (currently the radiation level at the separation magnet is 2mSv)
- supercycle changes: agreed changes for next week so that we get 3 spills in east hall during working hours and 4 during night and week-ends; the fourth spill will come around 4 sec later that the first three. new changes wil be discussed for week 34
- Luca to investigate on the possibilty of an extension with the MICE group which is supposed to run after GLAST 

 Online&DAQ Report

Ric confirms that agreed modifications on spill structure for next week will not hamper DAQ sync and data merge online

 OfflineReport

- Nicola reported on ancillary recon performance and tagger studies; taggeed electrons momentum resolution is 3.5% (beam+MS+tagger), better than expected. Current AD recon only available locally, working to make it available to everybody here w/o waiting pipeline to update; also speeding up release process and pipeline re-processing of tagged photon runs
- Monica B reported on preliminary studies of Tkr TOT
- Eric C reported on ACD calibrations; mapping of electronics is correct, geometry and recon in place but reconstructed tracks show small discrepancies with expected tiles positions (order 1 cm); MIP peak to determine VETO threshold relocated with CR after changing timing, tiles behave differently, will make sense to cross-check with beam (as done with Alex at the beginning of the run);
- Monica P reported that the last generated MC file for tagged photons has a BL=0.45 which is wrong; Luca B to udpate confluence with correct conversion plot for current vs bending power and tell Francesco

 Program

- agreed program (still) here
will have to rediscuss program again if intervention is required on separation magnet 

 Notes 

please provide Luca with updated presence of people at CERN to allow completion of shift list

...

 Communications

 - Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired in the morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 Online Report

 - DAQ sync studies going on
- CU: Ric investigating phasing errors

 Offline Report

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)
- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
- no CAL-HI triggers in last night data as  fhe values were saturated

 Program

 - Complete DAQ sync studies
- perform CU timing studies to optimize TACK (timing/script vs ext trigger manual delay)
- explore beam conditions 
- ACD calibrations (ideally 5gev p, if NA 5gev e) 
- CAL runs with e (Benoit)
- Tagger calibration start on 29 morning

Notes 

 - Fill elogbook
- Take your shifts and launch runs yourself 
<ac:structured-macro ac:name="unmigrated-wiki-markup" ac:schema-version="1" ac:macro-id="dba97e4c9196cf18-6f58ac06-416d4474-89519e48-af9a7620ce93187906ca4fc3"><ac:plain-text-body><![CDATA[- rcReport has wrong table positions for runs [701-736]; the right correlation table between position and run will be circulated. Please reset runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)