 july 28

13-3-05 005

- Magnet failure: MNP17 colling system failure at 1AM stopped data taking for several hours but no damage on hardware. Physics restarted after 2 hours w/o silicon tagger for CAL calibrations. Magnet repaired morning
- CU cooling system changes: CU/ISC cooling coil in the ISC base plate leaked: it was emptied and is now non available, we will rely on top cooling coil as no intervention is possible; the chiller was moved closer to the ISC to minimize thermalization of coolant with ambient through thermal exchange with the zone air, now chiller more efficient;  fan added to cool XY table motors. Please look at the temperature during your shift

 - DAQ sync studies going on
- CU: Ric investigating phasing errors 

 Francesco:
- pipeline  nicely running
- 1st 1000 evetns in SVAC ntuple duplicated  
Claudia: 
- offline monitor requires script to parse rcReport info and link to MC files (Navid working on that)

Wiki Markup
\- MC and CU cooprdinate systems mismatch (check with Philippe) 
Dave:
\- no CAL-HI triggers in last night data as  fhe values were saturated\\ |  \- Complete DAQ sync studies

...

\\
 \- perform CU timing studies to

...

 

 

 optimize TACK (timing/script vs ext trigger manual delay)
\- explore beam conditions 
\- ACD calibrations (ideally 5gev p, if NA 5gev e) 
\- CAL runs with e (Benoit)
\- Tagger calibration start on 29 morning  |  \- Fill elogbook
\- Take your shifts and launch runs yourself 
\- rcReport has wrong table positions for runs \[701-736\]; the right correlation table between position and run will be circulated. Please +reset+ runcontrol before starting a new run when you change conditions (table position, beam configuration, trigger, CU conf)  |
 

July 26 - room 13-2-005

10:30 : Safety visit from CERN: minor action items being followed by Luca L.

...