Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Excerpt

Hybrid #

Received

Passive components loaded / cleaned

Sent to UCSC

APV25s loaded

Wirebonded

Tested

Results

Sent to SLAC

Glued to carbon fiber

Part of half-module

Notes

Hybrid 0

10/10/11(RH)

?

?

?

?

?

?

?

?

Half-module 0

COMPLETE

Hybrid 1

10/10/11(RH)

?

2/1/12(PH,VF)

2/1/12(FM)

2/3/12(FM)

2/14/12 OM test 1

OK

2/22/12(OM)

2/23/12(TKN)

Half-module 1

COMPLETE

Hybrid 0t

2/21/12(RH)

2/22/12(RH)

2/23/12(AG)

2/24/12(FM)

2/27/12(FM)

2/29/12 OM test 1

OK

2/29/12(OM)

3/1/12(TKN)

Half-module 2

COMPLETE

Hybrid 1t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 3

COMPLETE

Hybrid 2t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 4

COMPLETE

Hybrid 3t

2/21/12(RH)

3/5/12(RH/PH)

3/5/12(PH)

3/6/12(FM)

3/7/12(FM)

3/7/12(OM) test 1

OK

3/7/12(JN)

3/10/12(TKN)

Half-module 5

COMPLETE

Hybrid 4t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/16/12 (VF, OM) 

Bad channel 210, else OK.

3/16/12 (PH)

?

Half-module 9

COMPLETE

Hybrid 5t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

3/14/12(FM)

3/15/12(FM)

3/15/12 (VF)

V125, AVDD, GND shorts => no readout test

3/16/12 (PH)

?

Half-module ?

Needs QA testing (PH)

Hybrid 6t

2/21/12(RH)

3/14/12(RH/PH)

3/14/12(PH)

Not loaded, loose connector wire(FM, VF)

back to SLAC


-

3/16/12 (PH)

-

-

continued on next line...

6t continued 

-

-

3/19/12(TKN/VF)

3/19/12(FM)

3/20/12 (FM)

3/20/12 (OM)
test 1

Bad channel 345, else OK.

3/20/12 (VF)

?

Half-module ?

READY

Hybrid 7t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 6

COMPLETE

Hybrid 8t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

APV0 defective? Could not set defaults => No test results.

?

?

Half-module ?

Needs further testing

Hybrid 9t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) 

Problems testing with DAQ

3/18/12 (VF)

?

Half-module ?

Needs further testing

Hybrid 10t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF) 

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 7

COMPLETE

Hybrid 11t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/16/12 (FM)

3/17/12 (FM)

3/17/12 (TC,VF)

OK

3/18/12 (VF)

3/18/12(TKN)

Half-module 8

COMPLETE

Hybrid 12t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

Not loaded, b/c of gauge mark on ASIC pad.

N/A

N/A

N/A

3/18/12 (VF)

?

Half-module ?

Salvage connector?

Hybrid 13t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module 10

COMPLETE

Hybrid 14t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module 11

COMPLETE 

Hybrid 15t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module ?

READY

Hybrid 16t

2/21/12(RH)

3/15/12(RH/PH/TKN)

3/16/12(PH)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module ?

READY

Hybrid 17t

?

?

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module ?

READY

Hybrid 18t

?

?

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

OK

3/20/12 (VF)

?

Half-module ?

READY

Hybrid 19t

?

?

3/19/12(TKN/VF)

3/19/12 (FM)

3/20/12 (FM)

3/20/12 (OM)

Bad channel 510, else OK

3/20/12 (VF)

?

Half-module ?

READY

...