Power restore

Power restore expected Friday night update: Saturday

  • SC turn on after PAMM
  • Thursday evening (15th)
  • Potential issue with 60 kV line and discussions of a brief power outage
    • Sebastian against it because it would take down the cryoplant

Damaged key

Damaged key for sector 0 key bank

  • There are spare keys that are locked up

Sunday night detune
  • AMRF did manual detuning on Sunday using the power boxes
  • AMRF preparing more boxes
  • It takes 3 min to move 50 kHz (one click) and some cavities needed 5 'clicks'
    • Time consuming
  • The procedure is not uniform (each cavity requires a different amount of movement)
    • We had no nice way of giving this information to those doing the detuning
      • There was lots of text communication with Sebastian
    • Our records of cavity states were out of date which delayed us getting the information to AMRF
    • We can create a sheet of how much each cavity needs to be moved since this doesn't change
    • Which cavity needs to be moved needs to be updated each time
  • According to Yuri we should be within 50 kHz of cold landing
    • It is not clear what is a safe margin
  • What's the problem with going too far?
    • We will hit the limit switch
    • The limit switch might fail
    • The limit switch might be too far past cold landing
  • Back up power for racks should be a facility level problem/solution
    • AMRF would just deploy a bunch of batteries which would be hard for them to maintain
  • We should plan out how to make this easier
    • This was the first time it was done and it had to be done for all CM
  • Improvement:
    • In-line connector that is easy to connect (current connectors need to be screwed on)
      • The cable connections slowed things down
  • Rack system moves four cavities at a time
    • To move fewer cavities you disconnect cables
  • Might be able to use a laptop running epics with an interface box to move the cavities independently per rack
    • Need to worry about keeping the laptop up to date and charged
    • Command line? Interface?
    • This might require more training
  • We should think about training up more people to be able to help with detuning
    • We were lucky that Andy was on site and more people were available
    • Potentially train people in SRF
    • Is there potential to train ops to help with this?
      • Janice: its hard to predict if ops would have bandwidth during a power outage
        • Sometimes they are waiting, and sometimes they have lots of calls
  • There were alarms going off in the gallery the whole time
  • It was not clear how to detune the HLs
    • How much does the tune change and is it the same direction
    • It is the same button press to detune on the chassis


  • Fallout from detune
    • Some screws on DB9 connectors would pull out
    • Some screws were broken off and damaged connections
    • They need to go and fix these
    • New limit switch faults might be caused by mechanical damage
      • Simple fix: replace screws

AMRF Notes
  • Many people will be out next week
  • Andy and Rick have a list of things they'd like to look at
  • Fallout from

RFS phase note matching PRL phase
  • Seen in 4 racks
  • Two racks have updated firmware, but two don't
    • New firmware might fix issues
  • If seen, just keep running rack checkout until it is fixed


  • New alarm for spotting this

Action items

  •