Time | Item | Who | Notes |
---|
| CM08 Fake Microphonics and Rack Checkout | Sonya, Ryan | - CM08 Lost Settings During PAMM and had weird apparent Microphonics. It was fixed by running rack checkout again
|
| Discussing on call | All | - Ryan: called at 2 AM on Saturday about unstable
- Lauren: worth early morning call just to continue phasing?
- Dan: Axel indicated we can now be called in the middle of night
- Nicole: should make clear that they are allowed to run SRF auto setup without calling
|
| H2-2, CM02 7,8 | Andy | - Andy asked about H2-2 problems. They are still on going as of this morning. More below
- H2-2 catered by NIcole
- CM02-7,8 RF chassis swap or careful bring up may have gotten it running again
- Start doing cable checks from tunnel for loose connections. 4 racks at a time each PAMM. Also checking LO and PRL connections.
|
| HL2-2 Instability | Ryan, Nicole | - H-2 regulation issues.
- looks like two cheetos/detune curves
- might be causing jitter and need for more feedback
- Slowly become unstable and lose amplitude
- Ryan: I don't think we can turn it off without triggering and LBLM fault. Tried this morning and did.
- Dan: Don't we have to turn those off in pairs?
|
| Tuner backup power | Andy | - Got some money for automating tuner backup unit
- No progress this fiscal year
- Will need to ask for money again for next fiscal year
|
| Measuring CM35 Radiation | Dan | - Cavity 35-4 making 3600 mR/hr at 11 MV (previous <50 mR/hr during commisioning)
- need to drop to 8 MV to get the level that low
- Why did it get worse? Rad increase does not coincide with a quench or anything
Plan: - Turn on decarad high voltage (cart in place)
- In CM35, 1 cavity at a time ramp up to ADES Max or radiation > 50 mR/hr
- Go to next cavity
- Recover L3
Nicole at least available. Will likely do tonight? |
| Testing H2-2 not being on | Janice | - Need to turn off H2-2, then run abstraction layer, and then turn beam back on
- Janice thinks could run
|
| Progress on autosetup backgroudn stuff |
| - Dan: Any progress on testing new code base for channel access issues
- Sonya working on putting epics infrastructure for Lisa
|