Date

Attendees

Goals

  • SRF-LLRF Combined Meeting

Discussion items

TimeItemWhoNotes
CM08 Fake Microphonics and Rack CheckoutSonya, Ryan
  • CM08 Lost Settings During PAMM and had weird apparent Microphonics. It was fixed by running rack checkout again

Discussing on callAll
  • Ryan: called at 2 AM on Saturday about unstable
  • Lauren: worth early morning call just to continue phasing?
  • Dan: Axel indicated we can now be called in the middle of night
  • Nicole: should make clear that they are allowed to run SRF auto setup without calling

H2-2, CM02 7,8Andy
  • Andy asked about H2-2 problems. They are still on going as of this morning. More below
  • H2-2 catered by NIcole
  • CM02-7,8 RF chassis swap or careful bring up may have gotten it running again
  • Start doing cable checks from tunnel for loose connections. 4 racks at a time each PAMM. Also checking LO and PRL connections.

HL2-2 InstabilityRyan, Nicole
  • H-2 regulation issues.
  • looks like two cheetos/detune curves
  • might be causing jitter and need for more feedback
  • Slowly become unstable and lose amplitude
  • Ryan: I don't think we can turn it off without triggering and LBLM fault. Tried this morning and did.
  • Dan: Don't we have to turn those off in pairs?

Tuner backup powerAndy
  • Got some money for automating tuner backup unit
  • No progress this fiscal year
  • Will need to ask for money again for next fiscal year

Measuring CM35 RadiationDan
  • Cavity 35-4 making 3600 mR/hr at 11 MV (previous <50 mR/hr during commisioning)
  • need to drop to 8 MV to get the level that low
  • Why did it get worse? Rad increase does not coincide with a quench or anything

Plan:

  • Turn off L3 CMs
  • Turn on decarad high voltage (cart in place)
  • In CM35, 1 cavity at a time ramp up to ADES Max or radiation > 50 mR/hr
  • Go to next cavity
  • Recover L3

Nicole at least available. Will likely do tonight?


Testing H2-2 not being onJanice
  • Need to turn off H2-2, then run abstraction layer, and then turn beam back on
  • Janice thinks could run

Progress on autosetup backgroudn stuff
  • Dan: Any progress on testing new code base for channel access issues
  • Sonya working on putting epics infrastructure for Lisa

Action items

  •