Install
- Verify power off. (MPOD panel or IoC panel)
- Install detector in experimental setup, consulting with beamline scientist.
- Connect gas line if applicable, start flow at 5l/m.
- Connect chiller, start flow. Set temp to 15C.
- Connect data fiber.
Power
- Set known values on mpod.
- Pin out cable according to diagram.
- Turn off mpod.
- Connect power cable to detector.
- Set operating voltages on mpod.
- Start DAQ and configure to begin idle.
Stabilize for 15 minutes
Record Voltage/Current/Temperature Values
Measure and Apply Pedestals
Update Traveller