Attendees

Goals

  • Set and status planning activities for detector development and deployment.

Discussion items

TimeItemWhoNotes
10 minBeamtime support update
  • Good progress during Fromme, more work to go.
  • XCS/MFX constants status (PH train Bhavna on processing CI data?)
  • Ghost-less 10kSmall in CXI...working?
  • Run 18 lessons learned reminder....hold until next week when Conny returns.
  • What worked well?
  • What we can do better?
  • What is the recurring issues needing attention?
  • What is most needed to make your job easier?
  • What do you wish people would know that would make your work smoother?
  • What do you wish you knew that would make your work smoother?
30 minPriorities ReviewAll
  • 2021 events:
    • Projects new starts:
      • VFCCD/ePixM downselect → ePixM selected, sciencec leadership considering smaller ePixM plus XPCS version.
      • SparkPix-S Phase II (full-size ASIC for sparsification, Tixel-based, underway, likely needs LGAD to meet PW spec)
      • ePixHR IV:  Prototype detector project underway
      • TXI Detectors (2Mp and 140kp based on ePixHR @5kHz) CDR Closed out, project underway.
      • ePixUHR (130nm TSV structure to reach 100kHz), planning, need to consider SparkPix-ED results.
    • Production:
      • spare modules (0.5 & 1mm) Module order in work, new sensor order out
      • Approved 3d copy of ePix10k2m: underway, November delivery
      • Approved spare quads for MEC:  underway, August delivery
      • Proposed in-air 2m/1mm, planning in work.
      • Proposed UED detector upgrade, planning in work.
      • Proposed ePix10k4m (concept)
    • RIXS-CCD/cooler test and verification:  Delivery delayed until mid-July
    • HiZ collaboration tests: SSRL LoI needed, Ge chamber tests
    • Outreach for R&D support (SparkPix-ED, SparkPix Delta).
    • Support effort for LCLS-II-HE instruments (performance verification/implementation planning)
    • SBIR effort for UXI.


  • Group priorities review:
    • Testing
      • CompEn bit function on 10k...update?
      • Review with TID the stitching progress, look for improvements.  Latest on switching noise?
      • Can we figure out what's wrong with ePix100/7?
      • RIXS-CCD cooler test planning. 
    • Analysis
      • Gather and process relevant commissioning data for Mp travellers on Confluence.
          • Solid pedestals
          • Noise map
          • Response uniformity (mini-X cu-fluorescence)
          • Bootstrap gain (sealed source)
          • Linearity (signal injection)
    • Documentation
      • Complete on-line travellers for Mp detectors

    • Development

    • Lab 'commissioning'
      • DAQ
        • Storage nodes  configured, put in use?
        • LCLS I/II compatibility?
      • Chase racks anchored....cables, water status?
      • Vac chamber for in-lab tests?  Compatible with XPP alcove?


Actions:


30 minStatus

LDAC Panel assembled (waiting on Kuster) 


KN:

  • Jungfrau installed at XPP, geometry file missing
  • Dan has fixed MFX DAQ, pedestals not applying properly....take peds scripts may need revision.
  • Maciej has provided timing info for new 10ka firmware, needs more test.
  • Spare JF Power supply received, need cold plate.
  • UED MPOD?

PH:

  • Started processing CI on CompEn exp....nothing jumps out.
  • MEC experiment on Thursday, detectors should be OK

BN:

  • Run cal on new ePix firmware.
  • Grafana setup to alert Slack channel.
  • Made updates to detector website, in work.
  • Working with PH on porting PyRoot to Python.

CK:

  • Run 19 deployment schedule through July.
  • Lesker chamber quote in work.
  • Materials for chase cable trays.Ge chamber assembly
  • Order/borrow Variac.
  • XPP having trouble with pgp server that runs 2M.
5 minBudget Updatemmck
  • M&S Status (Through March)



  • Labor snapshot (December actuals):


15 minReview ASC First Projectsall

Coordinate/update lab schedule.

10 minAny other business

Action items: